South Sulawesi
Strongest at
Large timber hulls and the deepest shipwright tradition.
Trade-off
Lowest cost for wood, less industrial supply.
Owner guide · Cost
Planning ranges, not quotations: enough to tell a hundred-thousand-dollar problem from a multi-million-dollar one before you spend money finding out.
The guide
Two boats of the same length can differ threefold. In order of impact: hull material, interior finish, systems, imported or local equipment, certification and the yard's region.
Timber phinisi is the lowest capital-cost route to a large hull. Steel buys durability and a straight path to class; aluminium buys weight and speed.
Fit-out is where budgets diverge fastest. On a boutique boat it can approach the cost of the bare hull, and dive systems with their power supply are a line of their own.
Building to a documented standard costs more during construction and pays it back at the first sale or the first claim.
A new build runs many months to a couple of years. Specification changes cause most delay, and registration adds real weeks after completion.
Refit cost scales with how far into the structure you go; a full conversion approaches new-build cost on an old hull.
Crew, fuel, provisioning, park fees, insurance, maintenance, docking and certification. Docking and spares are the lines most often underestimated.
Regional price differences
Most large projects end up split across regions for exactly these reasons.
| Region | Strongest at | Trade-off |
|---|---|---|
| South Sulawesi | Large timber hulls and the deepest shipwright tradition. | Lowest cost for wood, less industrial supply. |
| Java & Surabaya | Steel and aluminium fabrication, industrial supply. | Furthest from the operating area. |
| Bali | Fit-out, finish and imported equipment. | Priced accordingly. |
| Labuan Bajo | Closest to the operating area. | The least industrial depth. |
Every figure the desk gives is an indicative planning range. Real numbers come from a specification, a survey and a yard.
Owner-side costs
They arrive just as the build has consumed the budget.
Profile, specification, survey and yard
Cost questions
Short answers. Every figure is a planning range in USD, not a quotation.
Ask on WhatsAppThe range is wide: hull material, interior standard, systems, certification and yard region each move it. A simple timber phinisi and a classed steel expedition vessel can differ threefold at the same length.
Many months to a couple of years from contract to delivery, plus real weeks for registration, certification and clearance before the boat can carry passengers.
Usually, and it reaches revenue sooner. The test is how much of the hull and machinery survives; if most is replaced, you pay near new-build money for a secondhand structure.
Sulawesi leads on timber hulls, Java on steel and aluminium, Bali on fit-out and imported equipment, and Labuan Bajo is closest to the operating area but has the least industrial depth.
Supervision and survey fees, the entity and licensing work before registration, delivery voyage, initial spares, crew recruitment and training, and first-season working capital.
Send the vessel or the profile. We will tell you what a number depends on.
WhatsApp is fastest; email is better for drawings and documents. We reply in English or Indonesian.
Labuan Bajo, Flores and the Komodo National Park region. Yard work placed across Indonesia by hull material.
Quotations in USD. Contracts issued by PT Komodo Galangan Nusantara.