Structural work
Frame and floor renewal, keelson repair, replanking or plate renewal, deck recore and bulwarks.
Read the note : Structural work
Services · Komodo National Park
A structural and systems programme, not a redecoration. Survey first, interior last, certification alongside.
The refit order
Reverse the order and you rebuild the same cabin twice. Every refit we run follows one sequence, with certification tracked alongside it.
Contracts issued by PT Komodo Galangan Nusantara · Quoted in USD
Hull and machinery condition, opened up and measured.
Frames, floors, keelson, planking or plate.
Repower, shafts, stern gear, steering and thrusters.
Stabilisers, power, water, dive and tender handling.
Cabins and guest spaces, built once on a sound hull.
Step one
We do not quote a refit from photographs. Frames and floors are opened at sample points, thickness is measured, fastenings checked and engine hours verified against the machinery, not the logbook.
On a timber phinisi, look hardest at the garboard, the frame heels and under the engine beds: where fresh water sits and paint hides the worst of it.
Must do
What makes the vessel safe and certifiable. This list sets the budget.
Would like
What makes it commercially competitive. It follows once the first list is funded.
Six scopes, one project file
Most secondhand Komodo boats need work in more than one of these. We sequence them so nothing is built twice.
Stabiliser retrofit
Guest reviews here come down to food and roll. What you can fit depends on the structure and volume the hull already has.
A warning on hull extensions
A hull extension is a calculated job, not a carpentry job.
Added length aft changes trim, longitudinal strength and the flow into the propellers. Some extensions cost more in handling problems than the extra berths ever earned.
When an extension worksStarting a refit
We will tell you what has to be surveyed before any number means anything.
Send on WhatsAppBudget, slot, survey and permits
Refit questions
Short answers on timing, conversions, stabilisers and certification.
Ask on WhatsAppSystems and interior work runs a few weeks to a couple of months in yard. Structural work, repower or hull extension takes several months, and conversions longer. In the dry season the haul-out slot is usually the real constraint.
Often, if the frames, floors and keelson are sound. A physical hull survey decides it. Where a hull is too far gone, buying an already-certified boat is the better decision, and we will say so.
It depends where the roll hurts. Gyros avoid hull penetrations and work well at anchor; fins are more effective underway but need penetrations and hydraulics. Passive rigs suit at-anchor comfort only.
It can. Adding berths, moving bulkheads or changing escape routes all interact with passenger capacity, safety equipment and crewing, so certification stays in scope from day one.
No. We publish indicative ranges, but a quotation follows a hull and machinery survey. Numbers from photographs change the moment the paint comes off.
Send the vessel or the profile. We will tell you what a number depends on.
WhatsApp is fastest; email is better for drawings and documents. We reply in English or Indonesian.
Labuan Bajo, Flores and the Komodo National Park region. Yard work placed across Indonesia by hull material.
Quotations in USD. Contracts issued by PT Komodo Galangan Nusantara.